
Richardson Texas 75080
RECENT UPGRADES
Bathrooms / Plumbing
-
Added 3rd bathroom and installed new plumbing (2016)
-
Remodeled the other 2 bathrooms (2020)
-
Replaced the sewage lines in and out of the house (2016)
-
Added 2nd main drain clean-out line (2016)
-
Installed 2 new water heaters (2015)
-
Added new fans in bedrooms and on porch (2019)
Kitchen
-
Refinished all kitchen cabinets and put in new hardware (2019)
-
Installed new kitchen faucet (2020)
-
Installed gas double oven (2017)
-
Installed new dishwasher (2020)
-
Replaced garbage disposal (2018)
Lighting / Electrical
-
Installed new AC for house (2015)
-
Added led can lights throughout whole house and ran new electrical lines and dimmer switches (2019)
-
Installed Jonathan Adler Meurice Chandelier in Dining Room and ran new electrical line (2019)
-
Replaced exterior lights (2020)
-
Added entry light and ran new electrical line (2018)
Other Interior Updates
-
Painted the interior of the house (2020)
-
Built out the laundry room with new cabinets, led lighting, a long quartz countertop (great for folding!) and a new laundry door (2019)
-
Replaced thermostat with nest (2019)
-
Added barn door to rear living room (2019)
-
Installed new front door (2020)
-
Replaced 2 windows facing Floyd rd
-
Painted the exterior of the house, garage and workshop (2019)
-
Replaced all sprinkler valves (2018)
-
Tiled the front and side entrances (2016)
-
Installed wood privacy screen on side entrance (2016)
-
Planted new red maple tree in front yard from Bruce Miller Nursery (2019)
-
Planted 5 double althea trees along side of garage (2018)
-
Put in all new plants in front garden bed, as well as rose bushes along sidewalk on Floyd side of the road (2018)
-
Bricked in back driveway (2017)
-
Installed new garage opener (2020)

